91勛圖

鳥a莉棗紳紳梗娶

Construction start: Montreal Neurological Institute - Balustrade

91勛圖 has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.

The project consists of removing the stone balustrade.

Project manager: Johanne Guertin - Johanne.guertin [at] gph-inc.com

捩喝莉梭勳矇: 8 Nov 2023

Construction Start: MNI, Residences, Currie Gym, Milton Gate and Burnside Parking - Infrastructure for new parking equipment

91勛圖 has mandated Planit Construction to carry out the following project:泭MNI, Residences, Currie Gym, Milton Gate and Burnside Parking / 18-089 Lot 1 - Infrastructure for new parking equipment.

The project consists of infrastructure work that is required for the installation of new parking equipment for various parking lots on the 91勛圖 Downtown Campus: Montreal Neurological Institute, Residences, Milton Gate, Currie Gym and Burnside Garage.

捩喝莉梭勳矇: 8 Nov 2023

Construction start: Macdonald Stewart Building (Mac campus) - JELF Roy

91勛圖 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 20-021 JELF Roy.

The project consists of the renovation of lab MS2-094A on the second floor of the Macdonald Stewart Building.

Project manager:泭Mark Ouimet 泭mark.ouimet [at] mcgill.ca

捩喝莉梭勳矇: 19 Sep 2023

Construction start: Macdonald Stewart Building (Mac campus) - Basu Lab and Kitchenette

91勛圖 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.

The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.

Project manager:泭Mark Ouimet 泭mark.ouimet [at] mcgill.ca

捩喝莉梭勳矇: 19 Sep 2023

Construction start: Montreal Neurological Institute - Cyclotron aerial exhaust

91勛圖 has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.

The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.

Project manager:泭Eric Boutet, CIMA+ - eric.boutet [at] cima.ca

捩喝莉梭勳矇: 19 Sep 2023

Construction start: McIntyre Medical Building - Seventh floor laboratories

91勛圖 has mandated NR Brosseau to carry out the following project:泭McIntyre Medical Building / 21-008 - JELF, Chen.

The project consists of minor renovations of laboratory rooms 712, 723 and 726.

Project manager: Andrea Gore -泭Andrea.gore [at] mcgill.ca

捩喝莉梭勳矇: 6 Jul 2023

Construction start: McIntyre Medical Building - Electrical room

91勛圖 has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.

This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.

捩喝莉梭勳矇: 6 Jul 2023

Construction Start: Morrice Hall - Building envelope repairs

91勛圖 has mandated Corenov Constructeurs to carry out the following project:泭Morrice Hall / 22-038 - Priority building envelop repairs, lower roof.

The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.

Project Manager and泭Assistant Project Manager:

捩喝莉梭勳矇: 27 Jun 2023

Construction Start: Strathcona Music - Renovation of percussion studios

Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).

The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.

捩喝莉梭勳矇: 20 Jun 2023

Construction Start: McConnell Arena - Electrical upgrade

Please be advised that 91勛圖 has mandated Concept P.V.R. Inc.泭to carry out the following project : 18-156 McConnell Arena / Renovations (phase 1) Electrical upgrade

Description :

捩喝莉梭勳矇: 20 Jun 2023

Construction Start: Peterson Hall - Mechanical room upgrade

91勛圖 has mandated Corenov Constructeurs to carry out the following project: Peterson Hall / 14-113 - Mechanical room upgrade. The project includes preparing, patching, and painting walls, repairing and levelling floor slabs, and the restoration of surfaces around the mechanical room.

Project manager:泭Wendy Rivera - wendy.rivera [at] mcgill.ca

捩喝莉梭勳矇: 9 Jun 2023

Construction Start: MNI - Cyclotron

91勛圖 has mandated ARDEC to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron.

The project consists of replacing the cyclotron's conduit.

Project manager:泭Eric Boutet, CIMA+ -泭eric.boutet [at] cima.ca

捩喝莉梭勳矇: 17 May 2023

Construction Start: Bronfman Building - Parking infrastructure

91勛圖 has mandated Concreate Construction to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.

The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.

Project manager:泭Andr矇 Labelle -泭andre.labelle [at] mcgill.ca

捩喝莉梭勳矇: 17 May 2023

Construction Start: 680 Sherbrooke - Mock-up curtain wall

91勛圖 has mandated Vitrerie RD to carry out the following project: 680 Sherbrooke / 18-106 - Mock-up curtain wall.

the project consists of the removal, survey of existing conditions and replacement of three existing window panels inside classroom 491, as well as between floors (panels above and below).

Project manager:泭Andr矇 Labelle - andre.labelle [at] mcgill.ca

捩喝莉梭勳矇: 8 May 2023

Construction Start: Strathcona Music - Ceiling and door upgrades room E-109

91勛圖 has mandated NR Brosseau Inc to carry out the following project: Strathcona Music / 18-101 - room E-109.

The project consists of acoustical work in room E-109 and includes the installation of a new door, door frame and new acoustic ceiling tiles.

Project manager:泭Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:泭Jeremy Elbaz - jeremy.elbaz [at] mcgill.ca

捩喝莉梭勳矇: 5 May 2023

Pages

Back to top