Please be advised that 91勛圖 has mandated St-Denis Thompson Inc to carry out the following project:18-103 New Residence Hall - Restoration of Facades PHASE 2

嗨梗莽釵娶勳梯喧勳棗紳:泭Complete replacement of block facing on building facades and repair of concrete surfaces.

Construction start date: May 5, 2025

Planned construction end date: End of 2026

Work schedule:

Classified as: New Residence Hall
Published on: 29 Apr 2025

Please be advised that 91勛圖 has mandated CORENOV CONSTRUCTEURS to carry out the following project:23-027 Duff, CFI IF 2023, Siegel

嗨梗莽釵娶勳梯喧勳棗紳:泭Renovation of lab 615 including replacement of ceiling tiles, repairs to floors/walls, installation of new lab bench and sink

Construction start date: April 28, 2025

Planned construction end date: End of May 2025

Work schedule: Monday to Friday, 7 a.m. to 3 p.m.

Classified as: Duff
Published on: 24 Apr 2025

Please be advised that, following a winter break, construction work will resume with Ceveco Inc. to carry out the following project:19-016 Reconstruction of Upper Main Road, Downtown Campus.

嗨梗莽釵娶勳梯喧勳棗紳:泭Reconstruction of the Upper Main Road, from the Y intersection to the McCall MacBain Arts Building, including underground work.

Construction restart date: March 31, 2025

Planned construction end date: November 2025

Work schedule:Monday to Friday, 6 a.m. to 7 p.m. /Saturday, 6 a.m. to 7 p.m.

Classified as: Upper Main Road Downtown Campus
Published on: 31 Mar 2025

Please be advised that 91勛圖 has mandated J.L Prist to carry out the following project: 23-034 - Wong CFI IF 2023 Brochure

嗨梗莽釵娶勳梯喧勳棗紳:泭Renovation of rooms 2240, 2241, mainly around electrical and mechanical systems.

Construction start date:March17, 2025

Planned construction end date:July 18, 2025

Work schedule:Monday to Friday, 7:00 a.m. to 3 p.m. Works outside of building hours will be coordinated in advance.

Classified as: Wong Building
Published on: 26 Feb 2025

Please be advised that 91勛圖 has mandated Atwill-Morin Ma癟onnerie (Groupe Atwill-Morin Inc.) to carry out the following project:22-035 (B159) Lot 3 - Corrective masonry work on the corner of the staircase wall (MNI Rockefeller Wing)

嗨梗莽釵娶勳梯喧勳棗紳:泭The purpose of the work is to make the structural and masonry fixes required at the corner of the staircase wall of the Rockefeller wing of the Montreal Neurology Institute for safety purposes. The Rockefeller wing was built in 1934 and is located on University Street in Montreal.

Classified as: MNI Rockefeller Wing
Published on: 24 Feb 2025

Please be advised that 91勛圖 has mandated Plomberie Charbonneau to carry out the following project:23-012 - Currie Gym - Replacement of the multistack chiller

嗨梗莽釵娶勳梯喧勳棗紳:泭Installation of a new main chiller and its integration into the building control system.

Construction start date:February 17, 2025

Planned construction end date:May 30, 2025

Work schedule:Monday to Friday, 6:30 a.m. to 3 p.m. Works outside of building hours will be coordinated in advance.

Classified as: Currie Gym
Published on: 11 Feb 2025

Please be advised that 91勛圖 has mandated CORENOV CONSTRUCTEURS to carry out the following project:21-007 Parasitology Building JELF Lu and Liu

嗨梗莽釵娶勳梯喧勳棗紳:泭Renovation of lab P039 on the first floor of the Parasitology Building.

Construction start date: March 3rd, 2025

Planned construction end date: March 28th, 2025

Work schedule:Monday to Friday 6 a.m. to 3 p.m. Any additional hours will be coordinated.

Classified as: Parasitology Building
Published on: 6 Feb 2025

Please be advised that 91勛圖 has mandated Priest Construction-lectricit矇 to carry out the following project:14-140 Life Sciences Complex Shaft Reconstruction at room 140

嗨梗莽釵娶勳梯喧勳棗紳:泭The project involves reconstructing the wall of the mechanical shaft in Room 140 and painting one side of Corridor 1-HALL12.

Construction start date:January 27, 2025

Planned construction end date:February 21, 2025

Classified as: Life Sciences Complex
Published on: 27 Jan 2025

Please be advised that 91勛圖 has mandated XO Construction Inc. to carry out the following project:21-002 Raymond (Macdonald Campus) JELF Dastmalchi (Lot 2)

嗨梗莽釵娶勳梯喧勳棗紳:泭Renovation of room R1-038.

Construction start date: January 2025

Planned construction end date: July 2025

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Project Manager:mark.ouimet [at] mcgill.ca (Mark Ouimet)

Classified as: Raymond Building, Mac Campus
Published on: 23 Dec 2024

Please be advised that FMAS Operations, Southeast Sector, will carry out the following project:22-029 PULP & PAPER - JELF OCT 2022, Von Sperber

嗨梗莽釵娶勳梯喧勳棗紳:泭To carry out electrical works between Lab 202 and existing electrical panel in 2-Hall1

Construction start date:November 4, 2024.

Planned construction end date:November 30, 2024

Work schedule:Monday to Friday, 6 a.m. to 3 p.m., on a part-time basis

Classified as: Pulp & Paper
Published on: 29 Oct 2024

Please be advised that 91勛圖 has mandated Corenov Constructeurs to carry out the following project:22-028 Wong Mezzanine renovation

Description:Renovations to 3M055 and office 3M030 to create one new lab space.

Construction start date:September 2024

Planned construction end date: February 2025

Work schedule: Mondayto Friday, 6 a.m. to 3 p.m. Work outside of building hours will be coordinated in advance.

Classified as: Wong, renovation, Construction
Published on: 11 Sep 2024

Please be advised that 91勛圖 has mandated ISI Construction Inc. to carry out the following project:23-117 MNI (Neuro) - CFI JELF room 254 renovation

Description:Renovation of room 254 (incl. new interior finishes, upgrade of electromechanical services) to accommodate research needs.

Construction start date: September 11, 2024

Planned construction end date: November 15, 2024

Work schedule: Monday to Friday, 7 a.m. to 3 p.m.

Classified as: Neuro, MNI, Construction
Published on: 11 Sep 2024

Please be advised that 91勛圖 has mandated Atwill-Morin Ma癟onnerie to carry out the following project:22-033 Lyman Duff New Wing (B169) Priority building envelope repairs

嗨梗莽釵娶勳梯喧勳棗紳:泭Repair/replacement of damaged bricks & wall at the back of the building, adjacent to tunnel between MNI and Duff, up to the delivery dock of the Lyman Duff Building.

Construction start date:September 3rd, 2024

Planned construction end date:November 30th, 2024

Classified as: Lyman Duff
Published on: 5 Sep 2024

Please be advised that 91勛圖 has mandated Corenov Construction to carry out the following project:21-002 Raymond (Macdonald Campus) JELF Dastmalchi (Lot 1)

嗨梗莽釵娶勳梯喧勳棗紳:泭Renovation of room R1-038 and partial renovation of room R1-037.

Construction start date: August 12th, 2024

Planned construction end date: September, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Project Manager:Mark Ouimet -mark.ouimet [at] mcgill.ca

Classified as: Raymond JELF Dastmalchi
Published on: 13 Aug 2024

Please be advised that 91勛圖 has mandated Atwill-Morin Ma癟onnerie to carry out the following project:21-099 Strathcona Anatomy and Dentistry - Prototype for masonry restoration

嗨梗莽釵娶勳梯喧勳棗紳:泭Phase 2 of the renovation associated to the study aimed at confirming the condition of the masonry walls and identifying a strategy to renovate the building envelope.

Construction start date:July 8th, 2024* with mobilization potentially starting July 4th , 2024.

Classified as: Strathcona Anatomy Dentistry
Published on: 9 Jul 2024